Latest topics
» Post Qualification
Fri Jul 20, 2018 7:55 pm by siddecruz

» Acquisition RROW
Fri Jul 20, 2018 7:54 pm by siddecruz

» Cancellation of Notice to Proceed
Fri Jul 13, 2018 11:10 pm by Lumi

» retrieve of user ID and password
Thu Jul 12, 2018 12:45 pm by johnrayconcreteproducts

» Conduct of Post Qualification
Wed Jul 11, 2018 4:45 pm by ford15

» Can we consider the composition of the BAC as valid if one of the members refuses to perform function as BAC member?
Wed Jul 11, 2018 10:57 am by rubyrose

»  Locked PhilGEPS
Tue Jul 10, 2018 11:53 am by eumarmahal

» RE: INVITATION TO BID
Tue Jul 10, 2018 11:32 am by irishpugong

» Request for review of uploaded documents for platinum renewal
Tue Jul 10, 2018 10:27 am by zcabarios

» Platinum Membership Renewal?????
Tue Jul 10, 2018 10:23 am by zcabarios


CONSTRUCTION INSTALLATION AND MAINTENANCE OF TRASH TRAPS FOR UPPER MARIKINA RIVER BASIN PROTECTED LANDSCAPE (UMRBPL)

Go down

CONSTRUCTION INSTALLATION AND MAINTENANCE OF TRASH TRAPS FOR UPPER MARIKINA RIVER BASIN PROTECTED LANDSCAPE (UMRBPL)

Post by PENRO RIZAL on Tue Aug 28, 2012 4:30 pm

Mobilization of Manpower,tools and equipment, provision of approved storage
Installation of fabricated trash trap along waterways.

30 trash traps
approved budget--------------------- P 2,100,000.00

PENRO RIZAL
Valued Contributor
Valued Contributor

Female Number of posts : 201
Company/Agency : DENR-PENRO RIZAL
Occupation/Designation : PLANNING OFFICER II
Registration date : 2012-05-15

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum